The Maryland Department of Transportation State Highway Administration (SHA) is advising drivers of upcoming traffic pattern changes along Spa Road starting Sunday night, July 12 in connection with construction at The Village at Providence Point. This lane closure should be lifted by July 27, weather permitting.
According to a travel advisory issued by the SHA, the initial phase of work includes:
- Continuous 24-hour single-lane closure guided by a flagging operation on Spa Road between Forest Drive and Hunt Meadow Drive; and
- Temporary closure of the three driveway entrances along northbound Spa Road between Forest Drive and Old Forest Drive and the temporary closure of the Spa Road / Old Forest Drive intersection; patrons and residents will be directed to use Forest Drive to access this area.
Overall improvements include construction of a shared use-path along southbound Spa Road, Forest Drive at Spa Road intersection upgrades, widening and resurfacing of Spa Road to include installation of pavement markings, turn lanes and stormwater/drainage enhancements.
Arrow boards, cones and flaggers will be used to safely guide drivers through the work zone.
The opportunity to be part of senior living’s most extraordinary development in Annapolis, MD is available now — but you must act to take full advantage. Residences are filling fast. Reserve yours while there’s still a great selection available, and you can join your future neighbors in group gatherings and activities going on now.
