Construction at The Village at Providence Point is progressing through multiple phases, with building structures rising, interior systems being installed and site infrastructure continuing to develop. Recent photos document the transition from foundation to framing and mechanical installation phases.
Interior concrete slabs are complete in several areas, with mechanical, electrical and plumbing systems now being installed. Sewer line installation continues across the site as crews coordinate underground utility work with above-ground construction.
An additional crane will arrive at the site soon to support the increased pace of vertical construction.
The latest construction look-ahead includes continued slab pours, utility installations and site improvements, including work on the restoration of a degraded stormwater channel.
Additional construction updates and images from the site will be shared as progress continues.
The opportunity to be part of senior living’s most extraordinary development in Annapolis, MD is available now — but you must act to take full advantage. Residences are filling fast. Reserve yours while there’s still a great selection available, and you can join your future neighbors in group gatherings and activities going on now.